Categories
- Empenage (39)
- Elevators (11)
- Horizontal Stab (11)
- Rudder (13)
- Vertical Stab (5)
- Fuselage (2)
- General (16)
- Practice Kits (2)
- Tools (9)
- Wings (76)
- Ailerons (6)
- Flaps (1)
- Fuel Tanks (33)
- Spars (8)
- Workshop (4)
- Empenage (39)
Archives
- July 2010
- June 2010
- May 2010
- April 2010
- March 2010
- January 2010
- August 2009
- July 2009
- May 2009
- April 2009
- March 2009
- February 2009
- January 2009
- December 2008
- November 2008
- October 2008
- September 2008
- August 2008
- July 2008
- June 2008
- May 2008
- April 2008
- March 2008
- January 2008
- December 2007
- November 2007
- September 2007
- August 2007
Links to visit...
Monthly Archives: May 2008
Rudder Skeleton…
Began constructing the Rudder skeleton tonight. Got the spar, ribs, braces, etc riveted in. Also got the counterweight drilled, countersunk, the rib dimpled, and installed today. Since everybody seems to post a picture of their counterweight, I’ll do the same!
Back at it again…
After getting the official word from Vans on my edge distance issue, we are good to go. They said build on, the material is thick enough to maintain strength! So over the last couple of days I have spend very … Continue reading
Back to waiting (Edge distance issue)
After making the repair on the R-710, looking at the part after clecoing in place, I am concerned about edge distance for the affected area. The plans are calling for AN426AD3-4′s which require a 0.156″ edge distance. In the spot … Continue reading
My Repair
Well here is my repair work from a solution a fellow builder gave me… I’m gonna roll with this and build on!
Another oops…
While trimming the R-710 I was cutting away the hatched area per the plans using my straight snips and made the mistake of closing them all the way and cutting all the way to the tip, which distorted and somewhat … Continue reading
Rudder Skeleton
More work on the rudder today… feels good to be back at it, sweating all evening in the garage. Today I finished dimpling the skins, and riveted the stiffiners to the skins. Then construction of the skeleton began, which … Continue reading
Rudder Stiffiners.
The replacement skins from Vans showed up today. Packaged very nicely, no damage what-so-ever. Not even a dent in the box. Way to go FedEX! Tonight I got back to work on the rudder… Match drilled the stiffiners and skins, … Continue reading
Some downtime…
Sitting at idle for now, waiting on replacement rudder skins from Vans. The original ones sent with the kit had a dent right in the bend of the flange for the leading edge which was incurred during shipping. Vans was … Continue reading
Started the Rudder…
On to the next part of the kit… Now its time to build something to attach to what I’ve already built. Today was simple… Vans sends you a bunch of “sticks” of aluminum angle in which you must make … Continue reading
Finished Vertical Stabilizer!! :D
Man I just flew right through the Vertical Stabilizer… Small, few holes, etc make this part of the empenage kit a breeze! (Sorry for the blurry picture, I may replace it later but tonight this is it!! Hard getting everything … Continue reading